An FRP roof purlin that does not need to be recoated in the chemical atmosphere your building sits in
Pultruded FRP C-section and Z-section purlin for industrial building roofs. Replaces galvanized steel purlin in chemical, coastal, and salt-spray environments where the conventional purlin fails within the asset life. Sized to the published section properties; structural PE stamp on request.
Request profile quote View section properties
SECTION PROPERTIES - START HERE
Section properties below are nominal for the published pultruded FRP profile. The structural PE uses these for span, deflection, and capacity checks against the project load case.
|
Profile |
Section |
Depth × Flange × Lip (mm) |
Mass (kg/m) |
Moment of inertia Ix (cm⁴) |
Section modulus Sx (cm³) |
Span at 1 kN/m (m) |
|
C150 |
C-section |
150 × 50 × 15 |
{{2.8}} |
{{280}} |
{{37}} |
{{4.5}} |
|
C200 |
C-section |
200 × 60 × 20 |
{{3.6}} |
{{580}} |
{{58}} |
{{5.5}} |
|
C250 |
C-section |
250 × 75 × 20 |
{{4.5}} |
{{1,100}} |
{{88}} |
{{6.5}} |
|
C300 |
C-section |
300 × 80 × 25 |
{{5.4}} |
{{1,900}} |
{{127}} |
{{7.5}} |
|
Z200 |
Z-section |
200 × 60 × 16 |
{{3.6}} |
{{620}} |
{{62}} |
{{5.5}} |
|
Z250 |
Z-section |
250 × 75 × 18 |
{{4.5}} |
{{1,180}} |
{{94}} |
{{6.5}} |
|
Custom |
per project |
to 400 mm depth |
per calc. |
per calc. |
per calc. |
per calc. |
Section properties are nominal. Project-specific properties are validated against the published datasheet on first article. Span estimate uses 1 kN/m uniform load and L/200 deflection limit; verify on project load case.
What the buyer is trying to solve
Structural engineers specifying the next industrial roof.
The buyers who arrive at this page are structural engineers and building contractors specifying the roof framing for an industrial building in a chemical, coastal, or salt-spray environment. The existing galvanized steel purlin has rusted; the existing painted steel purlin is on its third paint cycle; the project spec has specified a 25-year service life and the conventional purlin will not survive it. They want a purlin that meets the published section properties, accepts the same cladding fasteners as the conventional choice, and does not need to be recoated.
Lightweight
~ ¼ the weight of the equivalent galvanized steel purlin; reduces the structural demand on the building frame.
01
Corrosion proof
Vinyl-ester pultruded purlin rated for the same chemical atmosphere as the rest of the FRP roof and wall package.
02
Same fasteners
Compatible with self-drilling metal cladding screws; no special tools.
03
25-yr asset life
No recoat, no rust, no unplanned shutdown to replace corroded purlins.
04
Specifications
|
Profile family |
C-section ({{150–300}} mm depth); Z-section ({{200–250}} mm depth); custom up to 400 mm |
|
Mass |
{{2.8–5.4}} kg/m for standard sections (verify on part drawing) |
|
Resin system |
Vinyl-ester (FR); isophthalic (economy); phenolic (HL3-rated) on request |
|
Glass schedule |
Continuous unidirectional roving + mat, balanced orthogonal |
|
UV package |
UV-9 inhibitor integral + UV-stable topcoat on visible surfaces |
|
Fire performance |
ASTM E84 Class A on request; ASTM D635 self-extinguishing |
|
Volume resistivity |
> 10⁸ Ω·cm (non-conductive) |
|
Operating temperature |
{{−50}} °C to {{+90}} °C continuous (resin dependent) |
|
Cladding fastener compatibility |
Self-drilling metal screws ({{#12, #14}}); pre-drilled on request |
|
Anchor to rafter |
Stainless A4 self-drilling bolts or through-bolts with isolating bushings |
|
Color |
Standard grey RAL {{7035}}; other RALs on request |
|
Design life |
{{25}} years in chemical atmosphere |
|
Standard length |
6 m and 12 m; custom up to {{18}} m |
When not to specify FRP purlin
Cases where steel purlin remains correct.
Three cases where we redirect
- Very heavy roof loads (snow zone above {{3 kN/m²}}). The FRP purlin has limited stiffness; in heavy-snow climates the project structural engineer will favor a steel section. Verify the span on first article.
- Co-located with high-voltage equipment above the roof. FRP is non-conductive - that is the point - but lightning protection must be designed separately. If the project specifies a conductive purlin for lightning path, FRP is the wrong material.
- Roof must support a heavy maintenance vehicle on the top surface. Walking the roof for maintenance is fine; rolling heavy equipment over the purlin span is a different load case and may exceed the section capacity.
Material comparison
|
Property |
Galvanized steel C250 |
Aluminum C250 |
Enbuss FRP C250 |
|
Mass per metre |
~ {{6.5}} kg/m |
~ {{2.5}} kg/m |
~ {{4.5}} kg/m |
|
Moment of inertia Ix |
~ {{600}} cm⁴ |
~ {{900}} cm⁴ |
~ {{1,100}} cm⁴ |
|
Coating cycle |
{{24–36}} months |
Anodize {{10–15}} yr |
None |
|
Salt-spray service life |
{{5–10}} yr (red rust) |
{{15–20}} yr (pitting) |
{{25}}+ yr |
|
Galvanic corrosion with aluminum cladding |
Yes - needs isolation |
No |
No |
|
Span at 1 kN/m load |
~ {{6.5}} m |
~ {{7.0}} m (deflection-limited) |
~ {{6.5}} m |
|
25-yr cost (chemical atmosphere) |
2 recoat cycles + possible replacement |
Some replacement |
No recoat |
Customization & OEM
Building contractors typically need a cut-to-length purlin with the project-specific hole pattern. We supply the purlin as cut lengths with pre-drilled holes where the cladding fastener pattern is known. Send the project drawing; first article {{6}} weeks; repeat {{3}} weeks.
Frequently asked questions
What is the typical lead time for a 4 km purlin order?
From PO to first delivery, typically {{8–10}} weeks for standard C200 / C250 sections in vinyl-ester grey. Custom section or color adds {{2}} weeks.
Does the purlin accept standard self-drilling cladding screws?
Yes. Self-drilling metal screws ({{#12, #14}}) drive directly into the FRP without pre-drilling on standard sections. For thicker sections, pre-drilling is recommended.
What is the design life?
{{25}} years in chemical atmosphere. Typical FRP pultrusion project life is set at {{25–30}} years for structural applications.
How is the purlin inspected in service?
Visual at annual walk-around; look for surface damage, UV chalking, or impact cracks. Any visible crack or fiber exposure is grounds for replacement. Inspection interval typically annual.
Does the purlin support a suspended ceiling?
Yes, on most sections. Suspend from the purlin flange with standard ceiling hangers; verify the local load on first article.
Can the purlin be supplied with a factory-applied fire-retardant topcoat?
Yes, ASTM E84 Class A topcoat is applied on request. Adds {{1}} week to lead time.
Is the purlin recyclable?
Vinyl-ester pultrusions can be shredded and used as filler in non-structural concrete. We offer a take-back program in pilot regions.
What documentation comes with each shipment?
Per shipment: dimensional inspection, resin lot certificate, ASTM E84 (if specified), structural PE stamp (on request), installation drawing.

Send a roof framing layout